An existing warehouse converted into operation factory and new office for a drinks manufacturer. The works involved
• Demolition
• New drainage
• Drylining ceilings and walls
• Air conditioning and extraction
• New kitchen areas
• Plant batching area
• Fire alarm
• Lighting, 3 phase power to equipment, small power
• Decorations
![](https://www.citysouthconstruction.co.uk/wp-content/uploads/2021/08/XUAP1221.jpg)
![](https://www.citysouthconstruction.co.uk/wp-content/uploads/2021/08/IWHR8276.jpg)
![](https://www.citysouthconstruction.co.uk/wp-content/uploads/2021/08/QTPH0755.jpg)
![](https://www.citysouthconstruction.co.uk/wp-content/uploads/2021/08/KOQT7090.jpg)
![](https://www.citysouthconstruction.co.uk/wp-content/uploads/2021/08/NDSC2953.jpg)
![](https://www.citysouthconstruction.co.uk/wp-content/uploads/2021/08/LDKT0038.jpg)
![](https://www.citysouthconstruction.co.uk/wp-content/uploads/2021/08/SXUZ1229.jpg)